CONSTRUCTION 4.0, YOUR COMPANY IS PREPARED?
This concept appears as a branching Industry 4.0 or also called "The Fourth Industrial Revolution". The incorporation of this scenario has been gradually and according to the technologies of each country. It appears this technological application through software with project management…
MILD CONCRETE WALLS
SMC Engineering and Consulting Ltd.. is the exclusive licensee of the Construction System Concrete walls reinforced Take molded on site, as DATEC 026-A approved by the Ministry of Cities, SINAT e PBQP-H. It is a methodology developed for large-scale construction that has high…
CHECK STEP BY STEP THE STEPS OF A BUILDING
1. SITE REVIEW Ponder field assessments as: data, size and condition of the terrain and surroundings. 2. PROJECTS The architectural project includes a detailed floor plan of the property, being, cortes, coverage, facades, Specifications of the openings (doors and windows), esthetic, spaces with good…
PATHOLOGIES OF CONCRETE
The use of concrete without adequate quality control, is in the design phase, implementation or use, It can lead to the appearance of several structural abnormalities, creating aesthetic problems or even jeopardizing the security and functionality of the structure. The defects presented…
INDIVIDUAL PROTECTION EQUIPMENT – AND
The use of PPE in the construction industry plays a fundamental role in the prevention of occupational accidents and safety, its absence causes occurrences with more serious injuries and fatalities. It is notable that the employee be vigilant with their duties, since research…
Condensation on building facades: A DANGER FOR RESIDENT
The air may contain water vapor to limit an amount which depends on its temperature. When the moisture content contained in the air is max, is said is saturated. The higher the air temperature, greater mass…
LIFE OF BUILDINGS
Based on ISO standards 14040 (Life Cycle Assessment. Principles and Structure) e 14044 (Life Cycle Assessment. Requirements and Guidelines), should follow the following four steps: 1- Purpose and scope of the study period: At this stage the team involved in the project…









