CHECK STEP BY STEP THE STEPS OF A BUILDING

CHECK STEP BY STEP THE STEPS OF A BUILDING
30 de May de 2019 by smcprojetos

1. ANALYSIS OF LOCAL
Ponder field assessments as: data, size and condition of the terrain and surroundings.
2. PROJECTS
The architectural project includes a detailed floor plan of the property, being, cortes, coverage, facades, Specifications of the openings (doors and windows), esthetic, spaces with good circulation, Thermal comfort and functional. Later, airframe designs, electrical installations and hidrossanitárias, telephony and internet will be aligned in the plane.
3. LEGALIZATION
The project architecture is legal according to the municipality's building codes for approval at the town hall, in which, It varies from 6 a 12 months. With the building permit in hand, start-se to work.
4. BUDGET
This stage determines all the expenses for the execution of work, from ideation to the service after delivery.
5. PLANNING
The completion of activities within the estimated time and cost are planned valuable items in a work.
6. TOP OF WORK
Encompasses cleaning, closing the land, mounting site, shed the works and earthmoving services. Later, the work lease with the assembly jig is made to the definition of the axes of execution of the foundations, walls and partitions.
7. FOUNDATIONS
Its purpose of preparing the ground to prevent problems such as cracks and crevices. Can be direct or shallow, built of reinforced concrete: isolated shoes, viga baldrame, radiers and running shoe. Indirect or deep, used on soils with low resistance, They are more common in homes, stakes type drills.
8. STRUCTURES
Are the skeletons of the building that are above the ground level as a basis for the project, be them, pillars, beams, slab and other structural components in reinforced concrete, steel or masonry.
9. WALLS AND SEALS
This process includes the lock structures by creating and columns of support straps walls, sealing elements and separation of built environments in ceramic blocks, concrete or plasterboard, settlement of door and window jambs, Drilling the walls plugs, and finally, the subfloor.
10. LINERS AND ROOFS
The roof of the building must provide safety for the moisture, thermal and acoustic. The slope and material used are of utmost importance to avoid leaks and future losses. Here are a few common tasks: lifting and towing the parapets, accommodate woods, roof tiles, screwing and embedding the rails.
11. FACILITIES HIDROSSANITÁRIAS
Establishment of hot and cold water, Sewer, cistern and finish the dishes, countertops, records, valves, hardware, years, accessories and finishes.
12. ELECTRICAL INSTALLATIONS
Passage of conduits, fios, installing cables and then the sockets and switches the building.
13. ADDITIONAL PREMISES
Gas distribution, TV, CCTV, internet, air conditioning, shower, tubs, hydro and other equipment are implemented at this stage.
14. FINISHES AND COATINGS
Adjustment of walls, and tile floors, porcelain tiles and ceilings; installation of sinks, pias, taps, cabinets and countertops. This phase depends on the roughcast plaster and for a good internal structure.
15. MITER
installation of doors, Wood windows, PVC, tempered glass and metal.
16. TEXTURES AND PAINTS
The painting will be carried out both internally and externally. Plan ink type and quantity of application of waterproofing and sealants.
17. EXTERNAL AREA
The goal of this process is to give life and beauty to the look of the work by the pool, quadra, area for barbecue, grass and garden planting.
18. CLEANING AND DELIVERY
Cleaning is necessary to ascertain whether all project standards have been met, besides testing the operation of all facilities. After this stage, the enterprise is ready to be habitable.

Márcio Estefano, Prof. PhD

lidiane Bazaglia30

Previous articlePATHOLOGIES OF CONCRETENext article MILD CONCRETE WALLS

2 comments

Marcos says:
26 the December the 2020 at 01:27

Congratulations on the content of this blog, did a great
job!
I really liked.
a big hug!!!

Reply
smcprojetos says:
5 the January, the 2021 at 21:33

Dear Marcos,

Thank you for your interest in our content, we are available.
Happy Prosperous Year!

Cordially,
SMC Engineering and Consulting Team

Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

SMC ENGINEERING

Our team consists of professionals of great experience and high qualification, joining the consecrated experience of our professionals with new generations of engineers and specialists accustomed to modern technology resources in engineering and construction.

Latest articles

THE CHALLENGES OF CIVIL CONSTRUCTION IN PANDEMIA25 the September the 2020
THE CHALLENGE OF WORKS IN CONDOS27 The February the 2020
EXCLUSIVE PARKING FOR CUSTOMERS: THIS MAY?15 the January, the 2020

SMC ENGINEERING

Our team consists of professionals of great experience and high qualification, joining the consecrated experience of our professionals with new generations of engineers and specialists accustomed to modern technology resources in engineering and construction.

Contact

Alameda Terracota, 185 – Cj 706. Ceramic neighborhood
Sao Caetano do Sul, SP - CEP: 09531-190
+55 11 4226-6013
smc@smcprojetos.com
himself. - Sex. 8:30AM - 17:30PM

Latest articles

THE CHALLENGES OF CIVIL CONSTRUCTION IN PANDEMIA25 the September the 2020
THE CHALLENGE OF WORKS IN CONDOS27 The February the 2020
EXCLUSIVE PARKING FOR CUSTOMERS: THIS MAY?15 the January, the 2020

Selo D-U-N-S® Registered™

Development Digital resource

About This Sidebar

You can quickly hide this sidebar by removing widgets from the Hidden Sidebar Settings.

Recent Posts

THE CHALLENGES OF CIVIL CONSTRUCTION IN PANDEMIA25 the September the 2020
THE CHALLENGE OF WORKS IN CONDOS27 The February the 2020
EXCLUSIVE PARKING FOR CUSTOMERS: THIS MAY?15 the January, the 2020

Categories

  • Blog

Meta

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org