SMC Projects
  • Home
  • SMC
  • projects
  • customers
  • Blog
  • Contact
Português English
19 de June de 2019 by smcprojetos

SAFETY AT WORK SITE: MAIN RISKS – Part 2

SAFETY AT WORK SITE: MAIN RISKS – Part 2
19 de June de 2019 by smcprojetos

The construction industry is one of the sectors with the highest number of accidents with workers who are subject to chemical, physical, biological and ergonomic. Therefore, as relevant as the project, budget and plan a work, it is necessary to care for and protect the physical integrity of all employees working in the enterprise. That depends on planning, training, organization and supervision along the gestors and staff.

Follow the publication the dangers associated with construction.

 Scaffolding: properly install and inspect equipment; securing nuts and bolts quality and tight; add media level and flat surfaces; mounting metal scaffolding, no minimum, five meters away from the electric installations; workers equipped with seat belts.
 Carelessness: lack of attention and focus of the collaborators; distracted employee can injure or cause accidents with other co-workers.
 Disorganization: concentration problems in the movement of persons and storage of equipment and materials.
 Electrical Equipment: NR-10 mandatory certificate and protective measures.
 Excavations: studying geological ground conditions before starting the works; interrupt the work in case of an apparent risk of slippage;
 Fire: forbidden to burn waste or material in the construction site and accumulate debris; electrical installations botched, failure to machines and explosion of flammable products.
 Cranes: operated only by trained and authorized personnel; Control Panel observation before use; monitor buttons, unusual noises, screws, cables and hook.
 Wells: cover with firm structures will any that entail some danger; well signal the location.
 Chemicals: are metals, gases or solvents, cause imminent risks.
 Quedas Object: compulsory use of safety boots, long clothing, gloves and helmet, to avoid cuts and burns.
 Noise: extended exposure to excessive noise causes irreversible damage to the worker; NR-15 provides for the allowed period of worker exposure.
 Signaling: using cards, barriers, zebradas tapes and other methods to prevent accidents.
 prohibited mobile phone use in the work.

More security and less unforeseen denote less changes in schedule, resulting assertive and projects delivered on schedule.

So, get to work!

Márcio Estefano, Prof. PhD

lidiane Bazaglia

Previous articleSAFETY AT WORK SITE - Part 1Next article SAFETY AT WORK SITE - Part 3

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

SMC ENGINEERING

Our team consists of professionals of great experience and high qualification, joining the consecrated experience of our professionals with new generations of engineers and specialists accustomed to modern technology resources in engineering and construction.

Latest articles

THE CHALLENGES OF CIVIL CONSTRUCTION IN PANDEMIA25 the September the 2020
THE CHALLENGE OF WORKS IN CONDOS27 The February the 2020
EXCLUSIVE PARKING FOR CUSTOMERS: THIS MAY?15 the January, the 2020

SMC ENGINEERING

Our team consists of professionals of great experience and high qualification, joining the consecrated experience of our professionals with new generations of engineers and specialists accustomed to modern technology resources in engineering and construction.

Contact

Alameda Terracota, 185 – Cj 706. Ceramic neighborhood
Sao Caetano do Sul, SP - CEP: 09531-190
+55 11 4226-6013
smc@smCPRojetthe.com
himself. - Sex. 8:30AM - 17:30PM

Latest articles

THE CHALLENGES OF CIVIL CONSTRUCTION IN PANDEMIA25 the September the 2020
THE CHALLENGE OF WORKS IN CONDOS27 The February the 2020
EXCLUSIVE PARKING FOR CUSTOMERS: THIS MAY?15 the January, the 2020

Selo D-U-N-S® Registered™

Development Digital resource

About This Sidebar

You can quickly hide this sidebar by removing widgets from the Hidden Sidebar Settings.

Recent Posts

THE CHALLENGES OF CIVIL CONSTRUCTION IN PANDEMIA25 the September the 2020
THE CHALLENGE OF WORKS IN CONDOS27 The February the 2020
EXCLUSIVE PARKING FOR CUSTOMERS: THIS MAY?15 the January, the 2020

Categories

  • Blog

Meta

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org